Commit Graph

28 Commits

Author SHA1 Message Date
Hawstein
7b8af30590 remove re-export of parking_lot in util (#6435) 2017-09-02 20:09:13 +02:00
Hawstein
2faa28ce9b separate semantic_version from util (#6438) 2017-09-02 13:14:21 +02:00
debris
94f717a255 Merge branch 'master' into keccak_fn 2017-08-31 11:53:26 +02:00
debris
f0e8abb07b Hashable::sha3 -> fn keccak for ethcore 2017-08-30 19:18:28 +02:00
debris
88200a1193 Merge branch 'master' into Fix-4858 2017-08-30 14:30:39 +02:00
Robert Habermeier
36d046f3ca do not activate genesis epoch in immediate transition validator contract (#6349) 2017-08-29 15:16:24 +02:00
Gav Wood
50495c6898 Merge branch 'master' into Fix-4858 2017-08-29 15:11:05 +02:00
Tomasz Drwięga
73644adf69
Rename network_id to chain_id where applicable. 2017-08-21 14:23:10 +02:00
Robert Habermeier
e43b1084c3 format instant change proofs correctly 2017-08-04 21:43:31 +02:00
Anton Gavrilov
655ed93ee8 Common engine method for bestowing rewards created 2017-08-04 11:28:26 +02:00
Anton Gavrilov
30434325a2 Modification of traces moved to engines 2017-08-03 15:55:58 +02:00
Anton Gavrilov
01ea968d4f Merge with master 2017-08-02 17:24:34 +02:00
Anton Gavrilov
2e840bc89c Fixed comments after the review 2017-08-02 17:10:06 +02:00
debris
a2c05123fd Merge branch 'master' into split 2017-08-01 14:24:47 +02:00
Nikolay Volf
b7006034b1 Decouple virtual machines (#6184)
* work in progress for splitting vms

* evm working

* Evm -> Vm

* wasm converted

* ethcore working

* test fixes
2017-08-01 13:37:57 +03:00
Anton Gavrilov
141c2fd34a Fixed comments after review and test after rebase 2017-07-31 18:10:06 +02:00
debris
81b57ceddb Merge branch 'master' into split 2017-07-31 16:19:59 +02:00
Anton Gavrilov
45043c3f52 Fixed errors after merge with master 2017-07-31 13:42:40 +02:00
Anton Gavrilov
204a63a00e Warnings removed 2017-07-31 13:40:45 +02:00
Anton Gavrilov
06862c7dee Tracing for rewards added. Without tests for now 2017-07-31 13:40:37 +02:00
Robert Habermeier
003eef982b Move more params to the common section. (#6134)
* move common forks and parameters to common params

* port specs over to new format

* fix RPC tests
2017-07-31 12:34:29 +02:00
debris
c4989ddc44 removed util::common 2017-07-29 22:49:10 +02:00
debris
eecd823d32 util reexports less std 2017-07-29 21:10:14 +02:00
Feynman Liang
5eb8cea6e7 Tendermint epoch transitions (#6085)
* Adds signals_epoch_end to tendermint

* Adds is_epoch_end

* Adds snapshot_components

* Adds tendermint Epoch Verifier

* Fix documentation typos

* Change check_finality_proof to panic

* Fix compilation

* Adds Unconfirmed path to epoch_verifier

* Verify if address is validator in EpochVerifier

* check_finality_proof errors on failure

* Don't share combine/destructure_proofs

* Remove invalid import

* Remove duplicate epoch verifier trait

* Fix docs

* Adds recover stub to tendermint EpochVerifier

* Adds verify_light test

* Avoid boxed closure

* Style fixes
2017-07-26 16:25:32 +01:00
keorn
22261bc2d1 New contract PoA sync fixes (#5991)
* generate proofs on newly-created state

* report only missed steps after first block

* dont report skipped if not signer

* test

* finality tracing and passing valid header to `commit_block`

* avoid proposing multiple times on the same step when validator set changes

* limit benign reports

* Ordering -> AtomicOrdering

* reinstate warning now that spam is reduced

* flush pending transition changes when necessary

* ensure epochs aren't re-zoomed on every block
2017-07-13 09:48:00 +02:00
Robert Habermeier
d365281cce Ethcore crate split part 1 (#6041)
* split out types into separate crate

* split out evm into its own crate
2017-07-12 13:09:17 +02:00
Vurich
3d8dc11442 Upgrade elastic-array to 0.9.0
This is a huge change, which includes some changes to replace code that
originally cloned to reuse allocations instead. The updated
`elastic-array` crate renames its consuming `Vec`-conversion method to
`into_vec`, which means that I can do a simple
`sed -i 's/to_vec/into_vec/'` and then fix the compilation errors.

This commit is probably a minor performance win and definitely a
significant readability win.
2017-06-29 13:05:33 +02:00
Robert Habermeier
d069b98b45 PoA: Wait for transition finality before applying (#5774)
* final engine changes

* migration to v13

* adding and removing pending transitions

* epoch_transition_for

* port snapshot to new engine methods

* final validator set interface

* fix compiler errors

* revert v13/epoch_depth transition

* make call on new epoch

* rolling finality checker

* tests for finality checker

* constructing finality proof upon pending transition

* fix warnings and finality proof checking

* fix compiler warnings in tests

* test fixes

* don't include genesis in finality checking

* change snapshot test chain building logic

* minor refactorings

* fetch epoch transition based on parent, fix divide-by-zero in SimpleList

* fix formatting

* fix ABIs and finality checking in snapshot restoration

* encode signal number in proof

* create more blocks at the end of tests

* update gist to accurate contract code

* test for epoch_transition_for

* fix tests with immediateTransitions parameter

* disable force flag after forcing

* rename ValidatorsChanged to InitiateChange and finalizeSignal to finalizeChange

* a few more validator set tests
2017-06-28 13:17:36 +02:00